Welcome to visit us!
[email protected]Mon-Sat Day: 8am to 6pm
Zhengzhou, HeNan, China
Example calculation Estimate the quantity of cement sand and stone aggregate required for 1 cubic meter of 124 concrete mix Ans Materials required are 7 nos of 50 kg bag of cement 042 m 3 of sand and 083 m 3 of stone aggregate... As a leading global manufacturer of crushing equipment, milling equipment,dressing equipment,drying equipment and briquette equipment etc. we offer advanced, rational solutions for any size-reduction requirements, including quarry, aggregate, grinding production and complete plant plan.
Get a Quote Leave MessageProduction Capacity: 50-800TPH
Application Field: Hydropower, building material, highway, city construction, metallurgy, coal mining and so on.etc.
Applied Materials: Granite, basalt, bank gravel, bauxite, cement clinker, quartz silicon carbide,limestone, river stone, etc.
Length: 6-8.5m
Processing Capacity: 20-99TPH
Application area: Slag industry, sandstone industry, etc.
Feeding Size: 120-1500mm
Product Capacity: 1-2200TPH
Application Field: Mining, metallurgy, construction, highway, railroad, and water conservancy, etc.
Rotation Speed: 0.1–5 r/min
Production Capacity: 21-155TPH
Product Specification: φ1.83×7~φ4.6×14m
Feeding Size: ≤25mm
Production Capacity: 200t/d-8,000t/d
Technological Features: Crushing raw materials, pre-homogenizing materials, arranging ingredients, efficient grinding, homogenizing materials, suspending pre-heater and decomposing furnace, new type cooler, cement dosing and grinding.
Feeding Size: 120-1500mm
Product Capacity: 1-2200TPH
Application Field: Mining, metallurgy, construction, highway, railroad, and water conservancy, etc.
Main Equipments: PE series jaw crusher, impact crusher, sand maker, raymond grinding mill, vibrating screen and vibrating feeder.
Further DetailsEquipped with vibrator feeder, jaw crusher, sand maker (vertical shaft impact crusher), vibrating screen, sand washer, belt conveyor and central electronic control, sand making plant can process the granite, limestone, basalt, cobble and other materials t
Further DetailsApplication:Mining, metallurgy, building materials, highway, railway, water conservancy and chemical engineering.
Further DetailsIn this plant, gold ore is mainly natural gold among the ore to be processed, but it is mostly distributed in the crack of poisonous sand, pyrrhotite and quartz crystal gap, which significantly improves the processing difficulty of the gold ore. The custo
Further DetailsCement grinding plant is the final stage in the production of cement, which is separated from the finished cement production units. It mixes cement clinker with other certain amount of mixed materials for grinding, and then produces the finished cement.
Further DetailsStone crusher plant whose design production capacity is 50-800T/H is mainly composed of vibrator feeder, jaw crusher, impact crusher, vibrating screen, belt conveyor, centralized electronic control and other equipment. Configuration of cone crusher and du
Further DetailsThe proportions of cement sand coarse aggregate and water plays an important role in determining the fresh and hardended properties of concrete So care should be taken while calculating the amount of Cement Sand and Aggregate required for 1 Cubic meter of Concrete Method1 DLBD method to determine material requirement for 1 Cum concrete The DLBD Dry Loose
Further DetailsAug 03 2018 · We Know in one bag of cement 1226 CFT For Calculate in CFT Cubic Feet 8 x 1225 98 Cubic Feet CALCULATION FOR SAND QUANTITY Consider volume of concrete 1m 3 Dry Volume of Concrete 1 x 154 154 m 3 Sand 1555 x 154 042 m 3 ∴ 15 is a part of Sand 55 is sum of ratio Density of Sand is 1450m 3
Further DetailsJul 06 2019 · Imagine I am going to fill an area measuring 5 feet by 3 feet using standard sand I want equal coverage to a thickness of 2 inches The sand’s density is 100 lbft³ and costs 10 per ton
Further DetailsQuantity of aggregate in cubic feet 3 x 154 55 x 353147 2966 Water For M20 30 liters of water per 50kg cement Total amount of water required 30 x 4032 50 24192 litre 8064 bags of cement required for 1 cum of M20 grade concrete 630 kg of Sand required for 1 cum of M20 grade concrete 1260 kg of 20mm Aggregate is required for 1 cum of M20 grade concrete
Further DetailsDLBD method to determine material requirement for Nominal Concrete Mix The DLBD Dry Loose Bulk Densities method is an accurate method to calculate cement sand and aggregate for a given nominal mix concrete This gives accurate results as it tak
Further DetailsSo 154 Cum of dry materials cement sand and aggregate is required to produce 1 Cum of concrete Volume of Cement required 1124 X 154 17 X 154 022 Cum Volume of Sand required 27 X 154 044 Cum or 1553 cft Volume of Aggregate required 47 X 154 088 Cum or 3105 cft Note 1 cubic meter 3529 cubic feet
Further DetailsA square yard of a sandbox with a depth of 1 foot 3048 cm weighs about 900 pounds 410 kg or slightly less than half a ton The water content of the sand is assumed to be moderate How much does a cubic meter of sand weigh A cubic meter of typical sand weighs 1600 kilograms 16 tonnes
Further DetailsMaterial required for 1cum concrete of M20 are as under Cement 8 bagscum Stone aggregate 10 20mm size087cum Coarse sand046 cumcum of concrete Therefore requirement for 1046 cum Cement1046×88468 bags or 85 bags Stone agg1046× 087910 cum Sand1046×046481 cum And if you want quantities of stone agg and sand in cft you may multiply quntities in cum by
Further DetailsRequired amount Cement quantity 63 Kg 126 bags 50 Kg bag Required amount of Sand 0306565 X 67 026277 Cubic metre m 3 Therefore For 1 cum of brickwork we need 500 Numbers of bricks 63 kg of cement 0263 m 3 of sand Feel free to use the below calculator Brickwork Calculator
Further Details